- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
re: Building cost / sq. Ft.
Posted on 6/15/17 at 9:06 am to PLaneTiger
Posted on 6/15/17 at 9:06 am to PLaneTiger
If you calculate the lot in the total we spent it was about 15% of the hole project.
The contractor included clear/fill/grade as A BUDGET number bc he was unsure how much fill would be required until the lot was cleared. That was right at 21K. We went over that to help grade the lot out better and to make the garage and house design jive better and that was roughly 6-7K extra.
The well and septic came in at 7K.
The contractor included clear/fill/grade as A BUDGET number bc he was unsure how much fill would be required until the lot was cleared. That was right at 21K. We went over that to help grade the lot out better and to make the garage and house design jive better and that was roughly 6-7K extra.
The well and septic came in at 7K.