If you calculate the lot in the total we spent it was about 15% of the hole project.

The contractor included clear/fill/grade as A BUDGET number bc he was unsure how much fill would be required until the lot was cleared. That was right at 21K. We went over that to help grade the lot out better and to make the garage and house design jive better and that was roughly 6-7K extra.

The well and septic came in at 7K.