- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Coaching Changes
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
LaDOTD Completes Bridge - Fails to Install Traffic Light Their Solution a Stop Sign
Posted on 7/1/25 at 5:52 am
Posted on 7/1/25 at 5:52 am
Monday afternoon in the pouring rain, crews finally removed the barricades and reconnected the community of Bourg separated by the reconstruction of the Company Canal Bridge after 4 long years of construction more than a year behind schedule.
But there is one shortfall, users of the bridge will have to stop at the intersection of 24 and 316 at the foot of the new bridge.
I watched a Facebook video of a guy blowing right through the intersection without noticing the new badly placed stop sign.
They have since placed a second stop sign near the road to make it more visible.
The big question is why DOTD did not install traffic lights prior to the completion of the bridge. It is not like they didn’t have over an extra year to construct the thing.
Don’t get me wrong I am grateful it is open as it will make my drive to work easier.
But there is one shortfall, users of the bridge will have to stop at the intersection of 24 and 316 at the foot of the new bridge.
I watched a Facebook video of a guy blowing right through the intersection without noticing the new badly placed stop sign.
They have since placed a second stop sign near the road to make it more visible.
The big question is why DOTD did not install traffic lights prior to the completion of the bridge. It is not like they didn’t have over an extra year to construct the thing.
Don’t get me wrong I am grateful it is open as it will make my drive to work easier.
Posted on 7/1/25 at 6:21 am to Tarps99
Was there a traffic light before?
Posted on 7/1/25 at 6:22 am to Tarps99
Because they are government employees?
Posted on 7/1/25 at 6:22 am to Tarps99
But, but, Louisiana is just one election away from turning it around!
Posted on 7/1/25 at 6:24 am to Meauxjeaux
quote:
Was there a traffic light before?
Yes
Posted on 7/1/25 at 6:31 am to Tarps99
LADOTD is useless. And extremely bloated.
Posted on 7/1/25 at 6:36 am to Tarps99
This is the same state that built a brand new airport and no way to get to it. Not surprising
Posted on 7/1/25 at 7:22 am to Tarps99
I think I’m gonna drive out of my way today just to use the bridge.
Posted on 7/1/25 at 7:36 am to Tarps99
quote:
The big question is why DOTD did not install traffic lights prior to the completion of the bridge
they were probably told to build a bridge..not build a bridge and place a light
Posted on 7/1/25 at 7:58 am to GrammarKnotsi
quote:
they were probably told to build a bridge..not build a bridge and place a light
He's assuming the state is responsible for the light and not the city or parish.
Posted on 7/1/25 at 8:01 am to magildachunks
quote:
He's assuming the state is responsible for the light and not the city or parish.
These are likely the same people that thought Landy and Teedy were responsible for floodwalls and levees.
They probably think state workers are who actually builds these things too
Posted on 7/1/25 at 8:07 am to Tarps99
All of my professional dealings with DOTD were a disaster, so this tracks.
Posted on 7/1/25 at 8:44 am to geauxtigers87
quote:
This is the same state that built a brand new airport and no way to get to it. Not surprising
“Hey, the planes can get to it!” - Some DOTD guy
Posted on 7/1/25 at 8:47 am to magildachunks
quote:
He's assuming the state is responsible for the light and not the city or parish.
Or that the Utility company screwed something up?
Posted on 7/1/25 at 8:48 am to geauxtigers87
quote:
This is the same state that built a brand new airport and no way to get to it. Not surprising
Holy hyperbole Batman. There was no flyover to get to the new terminal when it was originally built, but of course there were roads in place to access it when it was opened. How do you think people got there while the flyover was being built?
And unfortunately, this is how these projects get built everywhere. Blame it on how funds get allocated. Of course it would be nice to build all the new stuff at once, but that's not reality in a world that doesn't have infinite money.
Posted on 7/1/25 at 9:14 am to Tarps99
quote:
LaDOTD Completes Bridge - Fails to Install Traffic Light Their Solution a Stop Sign
Holy run on topic
Posted on 7/1/25 at 9:18 am to Tarps99
This is a 100' bridge. What really makes the 4 year thing suck is going on Youtube and watching the Chinese videos of them building a 100' bridge overnight, or in 2 days.
I wonder how long it took to build the bridge that this one replaced?
I wonder how long it took to build the bridge that this one replaced?
Posted on 7/1/25 at 9:19 am to Tarps99
Is a stop light necessary in Bourg LA?
Posted on 7/1/25 at 9:21 am to Tarps99
Is this the bridge it replaced? I am guessing it didn't have a traffic light?
Popular
Back to top

18













