Started By
Message
locked post

July 30th West Side construction update photos

Posted on 7/30/12 at 12:13 pm
Posted by JPLSU1981
Baton Rouge
Member since Oct 2005
26233 posts
Posted on 7/30/12 at 12:13 pm
LINK










Projection:
This post was edited on 7/30/12 at 12:47 pm
Posted by Wideman
Arlington, Virginia
Member since Jul 2005
11721 posts
Posted on 7/30/12 at 12:15 pm to
it will never be ready in time.
Posted by we_geaux_harder
alexandria
Member since Dec 2011
1194 posts
Posted on 7/30/12 at 12:15 pm to
Posted by gjackx
Red Stick
Member since Jan 2007
16523 posts
Posted on 7/30/12 at 12:20 pm to
quote:

it will never be ready in time.

It never is.
Posted by bbap
Baton Rouge, LA
Member since Feb 2006
96003 posts
Posted on 7/30/12 at 12:22 pm to
im sure it will be ready in time but they certainly do have a long way to go in 33 days. pretty significant progress since the last update but then again it was 12 days ago.
Posted by loopback
Member since Jul 2011
4859 posts
Posted on 7/30/12 at 12:22 pm to
TSCIOOC
Posted by themunch
Earth. maybe
Member since Jan 2007
64583 posts
Posted on 7/30/12 at 12:23 pm to
I like view number two.
Posted by Roberteaux
mandeville
Member since Sep 2009
5809 posts
Posted on 7/30/12 at 12:25 pm to
when do they start on the north side plaza by the student section?
Posted by bbap
Baton Rouge, LA
Member since Feb 2006
96003 posts
Posted on 7/30/12 at 12:26 pm to
i always assumed it was going to happen at the same time but last week someone said not until next year. And since they havent even started and the season starts next month, I'd say that's a pretty good assumption.
Posted by SomewhereDownInTX
Down in Texas, Somewhere
Member since Mar 2010
3318 posts
Posted on 7/30/12 at 12:33 pm to
It is gonna look fantastic
Posted by LSUdm21
Member since Nov 2008
17486 posts
Posted on 7/30/12 at 12:36 pm to
quote:

im sure it will be ready in time but they certainly do have a long way to go in 33 days. pretty significant progress since the last update but then again it was 12 days ago.


The weather the last few weeks is killing this thing.
Posted by 2007lsuno1
Marietta, GA
Member since Aug 2009
6692 posts
Posted on 7/30/12 at 12:40 pm to
Thanks for sharing with those of us behind enemy lines.

Posted by hg
Member since Jun 2009
123586 posts
Posted on 7/30/12 at 12:44 pm to
Any pics of outside the south end zone? Didn't they remove some oak trees?
Posted by Choot em Tiger
Member since Jan 2012
9748 posts
Posted on 7/30/12 at 12:49 pm to
The rain messed the schedule up
Posted by Elleshoe
Wade’s World
Member since Jun 2004
143616 posts
Posted on 7/30/12 at 12:50 pm to
They are letting updyke hone is craft out there
Posted by ABucks11
Baton Rouge
Member since Jan 2012
1141 posts
Posted on 7/30/12 at 1:11 pm to
Yea, they removed three live oaks
Posted by ianfson1
Houston
Member since Aug 2009
891 posts
Posted on 7/30/12 at 7:46 pm to
Nice new entrance will lead to a crappy, rundown facade with broken windows inside!
This post was edited on 7/30/12 at 7:49 pm
Posted by Algerian
New Orleans
Member since Jul 2011
646 posts
Posted on 7/30/12 at 7:54 pm to
This is lipstick on a pig. They need to marry the North Endzone with the West and get ready for the South Endzone Expansion. I hope this is the plan, we'll see.
Posted by Dodd
Member since Oct 2003
21048 posts
Posted on 7/30/12 at 7:56 pm to
Should have poured the paving in tiger stripe pattern
Posted by rohanman
Member since Aug 2008
303 posts
Posted on 7/30/12 at 8:14 pm to
Are they still going to put that "Tiger Stadium" signage up there on the facade? Bc it looks dumb in the renderings
first pageprev pagePage 1 of 2Next pagelast page

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram