Why not build a massive containment dome...

Posted on 6/4/10 at 11:44 am
Posted by ThatsAllSheWrote
Member since Aug 2005
1245 posts
Posted on 6/4/10 at 11:44 am
Why couldn't BP build a massive dome that would cover the entire BOP? I'm talking something along the lines of 10 stories tall and 100ft in diameter. Plumb the thing so they could circulate hot water throughout to prevent hydrate build up. Seems like this little top hat doesn't have a chance in hell due to the pressure from the well.
Posted by MountainTiger
The foot of Mt. Belzoni
Member since Dec 2008
14661 posts
Posted on 6/4/10 at 11:45 am to
A cofferdam like that was actually Plan A. They tried it and it failed.
Posted by Nature Boy
Negatiger
Member since Jan 2008
18977 posts
Posted on 6/4/10 at 11:46 am to
Well frick! Call BP right away and tell them your suggestion.

I can't believe this hasn't been done yet!
Posted by Jones
Member since Oct 2005
90447 posts
Posted on 6/4/10 at 11:46 am to
Im sure they could get something like that built in a few hours...ugh
Posted by ThatsAllSheWrote
Member since Aug 2005
1245 posts
Posted on 6/4/10 at 11:47 am to
quote:

A cofferdam like that was actually Plan A. They tried it and it failed.


That was placed over the broken riser and they didn't plan for the hydrate build up. With lessons learned and increasing the size of the dome seems like they could make that idea work.
Posted by Taxing Authority
Houston
Member since Feb 2010
57090 posts
Posted on 6/4/10 at 12:03 pm to
quote:

I'm talking something along the lines of 10 stories tall and 100ft in diameter. Plumb the thing so they could circulate hot water throughout to prevent hydrate build up.
Shouldnt take more than, like, two or three hours to build something like that. Can't imagine why they haven't done that. Why don't you call a fab yard and get it built. I'm sure bp would pay you for it. And lawd knows the fab yards are going to need the work.
Posted by MountainTiger
The foot of Mt. Belzoni
Member since Dec 2008
14661 posts
Posted on 6/4/10 at 1:37 pm to
quote:

That was placed over the broken riser and they didn't plan for the hydrate build up. With lessons learned and increasing the size of the dome seems like they could make that idea work.

Actually they were thinking that the smaller dome (i.e., the top hat) would allow them to inject methanol into it and reduce the hydrate buildup. The top hat was originally Plan B but they didn't try it for some reason and went to the top kill option.
Posted by redstick13
Lower Saxony
Member since Feb 2007
38449 posts
Posted on 6/4/10 at 1:39 pm to
Because Hank Rearden won't give them steel.
Posted by Chad504boy
4 posts
Member since Feb 2005
166134 posts
Posted on 6/4/10 at 1:41 pm to
quote:

Why couldn't BP build a massive dome that would cover the entire BOP? I'm talking something along the lines of 10 stories tall and 100ft in diameter. Plumb the thing so they could circulate hot water throughout to prevent hydrate build up. Seems like this little top hat doesn't have a chance in hell due to the pressure from the well.



It'd also be nice if these were already built too... You know to save the whole oil spill disaster for 60 plus days in our oceans and on our coastlines.
Posted by jfeezie
Madison, MS
Member since Jul 2008
191 posts
Posted on 6/4/10 at 1:43 pm to
quote:

Shouldnt take more than, like, two or three hours to build something like that. Can't imagine why they haven't done that. Why don't you call a fab yard and get it built. I'm sure bp would pay you for it. And lawd knows the fab yards are going to need the work.


Build one? Crap I got dem in stock!
This post was edited on 6/4/10 at 1:44 pm
Posted by Chad504boy
4 posts
Member since Feb 2005
166134 posts
Posted on 6/4/10 at 1:47 pm to
They should have originally took the roof off the super dome and used that to place on top of leak and BP just pay for a new stadium for our city. The stadium may end up being cheaper.
Posted by CrazyTigerFan
Osaka
Member since Nov 2003
3273 posts
Posted on 6/4/10 at 2:48 pm to
The cofferdam in Plan A didn't have the methanol pumps that the current tophat-riser scheme is using.

The cofferdam in Plan A was also used over the riser, not the BOP, if I remember correctly. That type of partial solution is obviously no longer an option.
Posted by foshizzle
Washington DC metro
Member since Mar 2008
40599 posts
Posted on 6/4/10 at 4:40 pm to
One reason hydrates get formed and gunk things up is because the seawater gets in with the oil. That's why the current cap (which doesn't have a tight seal) deliberately leaks some of the oil out, to keep out the seawater.

Since you need a (reasonably) tight seal, having a cavernous metal shell doesn't really do anything for you if you're pumping the oil out as fast as it comes in.
Posted by Tigerstudent08
Lakeview
Member since Apr 2007
5776 posts
Posted on 6/4/10 at 7:55 pm to
and just how do you plan on getting this 10 story 100ft in diameter dome out there and then placed directly over the well?
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram