Posted on 11/1/16 at 11:30 am
Posted by DzNtz
BR
Member since Oct 2007
684 posts
Posted on 11/1/16 at 11:30 am
I have a commercial project (approx 10,000sf retail center) coming out of the ground. The architect has just resubmitted revised drawings for the job to the city permit office this morning (so they say). Anyone have any insight as to how long getting the permit would take after resubmitting the plans? I have foundation forms set and plumber has started underground work but can't call for inspection until permit is approved!

Thanks
Posted by 4WHLN
Drinking at the Cottage Inn
Member since Mar 2013
7579 posts
Posted on 11/1/16 at 11:33 am to
Have you called them and asked whats the turnaround time is of late?

Last week they were running around 6 weeks for residential. Good luck dealing with the commercial division, they are the worst.
This post was edited on 11/1/16 at 11:34 am
Posted by DzNtz
BR
Member since Oct 2007
684 posts
Posted on 11/1/16 at 11:36 am to
I went to their office last week to ask about a foundation only permit but was told no (didn't get a good explanation but something about that would take even longer). I was told they would get on it as soon as they received the drawings. That's all they would say
Posted by 4WHLN
Drinking at the Cottage Inn
Member since Mar 2013
7579 posts
Posted on 11/1/16 at 11:49 am to
quote:

That's all they would say

Talk to Mrs. Gail. Shes usually very helpful up there and should be able to give you more insite to where the plans stand.
You can also follow your permit on line and that will outline everything that is needed so you can make sure you have everything to keep it moving smoothly. Trust me they will frick something up or lose some paperwork you gave them.

Good Luck
Posted by whit
Baton Rouge
Member since Sep 2010
10998 posts
Posted on 11/1/16 at 12:37 pm to
quote:

Trust me they will frick something up or lose some paperwork you gave them.
Posted by Beer did clam
BatonRouge where CATS are RATZ
Member since Oct 2009
541 posts
Posted on 11/1/16 at 12:47 pm to
Go ahead, commercial plan review will not answer the phone.
6-8 weeks initially and at least 4 between resubmissions. I've had a small project before them via my government.com since early Aug.
Swamped after flood is the excuse.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram