Started By
Message

South Endzone Construction Update 12/18

Posted on 12/18/13 at 11:21 am
Posted by HowboutthemTigers
BHAM
Member since Dec 2007
2628 posts
Posted on 12/18/13 at 11:21 am
LINK



Proposed:

















This post was edited on 12/18/13 at 11:33 am
Posted by PrimetimeDaBoss
Swag City, USA
Member since Oct 2008
7144 posts
Posted on 12/18/13 at 11:24 am to
It's gonna be ready in time!!!!
Posted by Cmlsu5618
Destin, FL
Member since Sep 2010
3763 posts
Posted on 12/18/13 at 11:41 am to
Can't wait for this to be finished if for nothing else than to stop the "ready in time" jokes.

They have become pretty bland.
Posted by T
Member since Jan 2004
9889 posts
Posted on 12/18/13 at 11:43 am to
they forgot to include concession stands and bathrooms in the original plan so they had to make them separate structures on the top level. those are the boxes you see sticking up. this may actually top the pvc pipe mistake. pretty amazing that they did this.
Posted by tigerfan in bamaland
Back Home now
Member since Sep 2006
61076 posts
Posted on 12/18/13 at 11:50 am to
Does anyone know who the Ready Mix company is that is providing the concrete?

TIA
Posted by bbap
Baton Rouge, LA
Member since Feb 2006
96003 posts
Posted on 12/18/13 at 11:51 am to
where did you hear that?
Posted by GeauxxxTigers23
TeamBunt General Manager
Member since Apr 2013
62514 posts
Posted on 12/18/13 at 11:51 am to
What are those unsymetrical random pillars supposed to be.
Posted by Bmath
LA
Member since Aug 2010
18664 posts
Posted on 12/18/13 at 11:53 am to
quote:

they forgot to include concession stands and bathrooms in the original plan so they had to make them separate structures on the top level. those are the boxes you see sticking up. this may actually top the pvc pipe mistake. pretty amazing that they did this.



Posted by GeauxxxTigers23
TeamBunt General Manager
Member since Apr 2013
62514 posts
Posted on 12/18/13 at 11:55 am to
quote:

they forgot to include concession stands and bathrooms in the original plan so they had to make them separate structures on the top level. those are the boxes you see sticking up. this may actually top the pvc pipe mistake. pretty amazing that they did this.


That is beyond any facepalm pic or gif I could possibly ever find.
Posted by Mr.Wolf
solving problems
Member since Nov 2012
1840 posts
Posted on 12/18/13 at 11:58 am to
quote:

Can't wait for this to be finished if for nothing else than to stop the "ready in time" jokes.

They have become pretty bland.



You obviously don't know how the ready in time jokes work.
Posted by bwallcubfan
Louisiana
Member since Sep 2007
38107 posts
Posted on 12/18/13 at 12:00 pm to
quote:

they forgot to include concession stands and bathrooms in the original plan so they had to make them separate structures on the top level. those are the boxes you see sticking up. this may actually top the pvc pipe mistake. pretty amazing that they did this.


and you have proof of this?
Posted by heartbreakTiger
grinding for my grinders
Member since Jan 2008
138974 posts
Posted on 12/18/13 at 12:03 pm to
is it bad that it is actually believable?
Posted by hg
Member since Jun 2009
123547 posts
Posted on 12/18/13 at 12:04 pm to


Hahaha

Look at those stairs. What idiots!!
Posted by GeauxxxTigers23
TeamBunt General Manager
Member since Apr 2013
62514 posts
Posted on 12/18/13 at 12:06 pm to
quote:

is it bad that it is actually believable?



I believe it. LaTech, supposedly a great Architecture school, built their main HQ tower building with all the windows facing East and West but none on the N and S sides. Supposedly they're getting killed on the AC bill from that frickup. They also built their brand new Olympic sized pool about a foot too short so they can't use it for meets.

fricking idiots.
Posted by JermStone
Beaumont, Tx
Member since Jun 2008
5741 posts
Posted on 12/18/13 at 12:21 pm to


This does look like concession and restrooms at the top but it seems to me to just be an open concourse type that you would see in the out field of a baseball stadium or something.

Posted by HowboutthemTigers
BHAM
Member since Dec 2007
2628 posts
Posted on 12/18/13 at 12:24 pm to
quote:

This does look like concession and restrooms at the top but it seems to me to just be an open concourse type that you would see in the out field of a baseball stadium or something.



Thats what im thinking too. Their not adding bleachers on top. itll be an open air area for "standing room only" people i would assume
Posted by bbap
Baton Rouge, LA
Member since Feb 2006
96003 posts
Posted on 12/18/13 at 12:26 pm to
quote:

is it bad that it is actually believable?



i know right.
Posted by Pintail
Member since Nov 2011
10406 posts
Posted on 12/18/13 at 12:27 pm to
quote:

Can't wait for this to be finished if for nothing else than to stop the "ready in time" jokes.


Been around long before the SEZ
Posted by Roberteaux
mandeville
Member since Sep 2009
5807 posts
Posted on 12/18/13 at 12:39 pm to
Posted by BRAVEHEART
Member since Aug 2012
1525 posts
Posted on 12/18/13 at 12:40 pm to
quote:

they forgot to include concession stands and bathrooms in the original plan so they had to make them separate structures on the top level. those are the boxes you see sticking up. this may actually top the pvc pipe mistake. pretty amazing that they did this.
quote:

That is beyond any facepalm pic or gif I could possibly ever find.
In my best Richard Condon voice. "You gotta be frickin kiddin me." That's lawsuit level incompetence if true. Can anybody confirm this with the LSUAD if actually true?
first pageprev pagePage 1 of 5Next pagelast page

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram