Started By
Message

PMAC's new, larger scoreboard could be just the start!

Posted on 7/20/17 at 10:30 am
Posted by TigersOfGeauxld
Just across the water...
Member since Aug 2009
25057 posts
Posted on 7/20/17 at 10:30 am
A new and very large video board has been installed at the Pete Maravich Assembly Center



The Maravich Center will be home to the largest center hung videoboard in the nation!



quote:

Those PMAC renovations Alleva spoke of earlier this year? Here's LSU's new, massive scoreboard. A new court may be on the way too.


Here's what the old one looked like:



quote:

Soon, the PMAC could have more than just a new video board.

Imagine club level seating, possibly even suites and an expansive entrance lobby. Those are long-term plans for LSU’s 45-year old basketball arena, school officials revealed Monday during the Tiger Athletic Foundation’s Tiger Tour in Baton Rouge.

Architects have already been at work on possible plans for the arena, said Eddie Nunez, LSU’s deputy director of athletics in charge of projects. The two areas of emphasis are the entrance to the building, currently two ramps up to the second floor, and premium seating, which is nonexistent at the PMAC.

“We’ve already had some conceptual plans drawn up to see kind of how we make it better,” Nunez said. “We had some architects do some preliminary work. It is something we really need to do for that venue.” The arena is getting a new four-sided video board, suspended over midcourt, this summer. The HD-quality board is scheduled for installation in July, Nunez said.

There are plenty of other changes coming in the future. Athletic director Joe Alleva told the crowd on Monday that he’d like to raze the two ramps, replacing them, potentially, with escalators and constructing a “nice lobby in the front of the building.”

On the inside, officials are hoping to remove seating, possibly decreasing the 13,215 capacity, in order to add club or suite levels, Alleva and Nunez said. “It has to be modernized,” Alleva said of the PMAC.

“I’d like to build a club level at the PMAC. Just like in football and baseball we have club areas. We need a club area in the PMAC. Those will be plans we’re laying out here in the near future I hope.” The location of the club level is uncertain, Nunez said. The most illogical would be on the floor level because that would remove too many seats, he said. The ideal location is on the second or third (top) tier of the arena.

“The good part about it is our second level really isn’t a second level traditionally. It’s not far up,” Nunez said. “If you take that area ... Is that the best? Or is it the third level? Those are things (architects) are going to try to figure out.”


Advocate

This post was edited on 7/21/17 at 1:04 pm
Posted by BilJ
Member since Sep 2003
158721 posts
Posted on 7/20/17 at 10:32 am to
awesome....now fix the student section and we may be getting somewhere close to a decent atmosphere again
Posted by jampat
Denham Springs, LA
Member since Jan 2007
11079 posts
Posted on 7/20/17 at 10:35 am to
50% of the boards will be filled with advertisement equaling the already present size videos for replay.
Posted by TigersOfGeauxld
Just across the water...
Member since Aug 2009
25057 posts
Posted on 7/20/17 at 10:36 am to
Quite honestly, I think we need a new facility in a new location, like on the other side of Nicholson.

But baby steps I guess.
Posted by SportTiger1
Stonewall, LA
Member since Feb 2007
28499 posts
Posted on 7/20/17 at 10:36 am to
Nice!
Posted by TigersOfGeauxld
Just across the water...
Member since Aug 2009
25057 posts
Posted on 7/20/17 at 10:37 am to
quote:

50% of the boards will be filled with advertisement equaling the already present size videos for replay.


And it won't be ready in time, either.

Posted by SPEEDY
2005 Tiger Smack Poster of the Year
Member since Dec 2003
83335 posts
Posted on 7/20/17 at 10:39 am to
quote:

Quite honestly, I think we need a new facility in a new location, like on the other side of Nicholson.




We don't need a new arena. Would be a waste of money. A new arena isn't gonna attract more fans. A better product on the court will.
Posted by TGR
NOLA
Member since Feb 2007
6229 posts
Posted on 7/20/17 at 10:42 am to
The new arena idea was pretty much thrown out the window when they decided to spend money on the practice facility addition.
Posted by tigerbait2010
PNW
Member since May 2006
29115 posts
Posted on 7/20/17 at 10:44 am to
quote:

Quite honestly, I think we need a new facility in a new location, like on the other side of Nicholson.

But baby steps I gues





It's a win-win to me at this point. I like an on campus facility, and Alleva has already said LSU can add club seating and suites. It sucks it'll never match the campus architecture, but lots of nice arenas are ugly on the exterior


Also we'll never build one given the practice facility is pretty new. we're not going to throw 10 million down the drain.
Posted by BilJ
Member since Sep 2003
158721 posts
Posted on 7/20/17 at 10:45 am to
yeah the PMAC could use some sprucing up, but it would be a total waste to build a new one

Wade will have the house packed soon enough
Posted by tigerbait2010
PNW
Member since May 2006
29115 posts
Posted on 7/20/17 at 10:48 am to
Is anyone else a little concerned we're pulling an Auburn football with the largest video board in the country? The PMAC is pretty big, but I'm not sure the largest scoreboard in the country would work in the PMAC
Posted by Uncs
Member since Aug 2008
3080 posts
Posted on 7/20/17 at 11:10 am to
IT's for Girls Gymnastics not Basketball
Posted by Tiger Nation 84
Member since Dec 2011
36510 posts
Posted on 7/20/17 at 11:14 am to
Would be nice if they just put a new paint job on the P Mac, updated the seating a bit, and gave the arena some better lighting . But I always loved the Mac. This video board will go a long way with the appearance though, we definetly don't need a new arena, that would be a waste.
This post was edited on 7/20/17 at 11:16 am
Posted by TigersOfGeauxld
Just across the water...
Member since Aug 2009
25057 posts
Posted on 7/20/17 at 11:24 am to
quote:

Would be nice if they just put a new paint job on the P Mac, updated the seating a bit, and gave the arena some better lighting


This was posted earlier in another thread....

quote:

Soon, the PMAC could have more than just a new video board.

Imagine club level seating, possibly even suites and an expansive entrance lobby. Those are long-term plans for LSU’s 45-year old basketball arena, school officials revealed Monday during the Tiger Athletic Foundation’s Tiger Tour in Baton Rouge.

Architects have already been at work on possible plans for the arena, said Eddie Nunez, LSU’s deputy director of athletics in charge of projects. The two areas of emphasis are the entrance to the building, currently two ramps up to the second floor, and premium seating, which is nonexistent at the PMAC.

“We’ve already had some conceptual plans drawn up to see kind of how we make it better,” Nunez said. “We had some architects do some preliminary work. It is something we really need to do for that venue.” The arena is getting a new four-sided video board, suspended over midcourt, this summer. The HD-quality board is scheduled for installation in July, Nunez said.

There are plenty of other changes coming in the future. Athletic director Joe Alleva told the crowd on Monday that he’d like to raze the two ramps, replacing them, potentially, with escalators and constructing a “nice lobby in the front of the building.”

On the inside, officials are hoping to remove seating, possibly decreasing the 13,215 capacity, in order to add club or suite levels, Alleva and Nunez said. “It has to be modernized,” Alleva said of the PMAC.

“I’d like to build a club level at the PMAC. Just like in football and baseball we have club areas. We need a club area in the PMAC. Those will be plans we’re laying out here in the near future I hope.” The location of the club level is uncertain, Nunez said. The most illogical would be on the floor level because that would remove too many seats, he said. The ideal location is on the second or third (top) tier of the arena.

“The good part about it is our second level really isn’t a second level traditionally. It’s not far up,” Nunez said. “If you take that area ... Is that the best? Or is it the third level? Those are things (architects) are going to try to figure out.”


Advocate
Posted by lsusportsman2
Member since Oct 2007
27232 posts
Posted on 7/20/17 at 11:43 am to
Well this is a start.
Posted by alterego55
baton rouge
Member since Apr 2016
1314 posts
Posted on 7/20/17 at 11:52 am to
need to pressure wash the roof. looks bad from outside
Posted by bharris4qb1
Member since Jun 2015
208 posts
Posted on 7/20/17 at 1:01 pm to
This was my rank of things that needed to be done to the PMAC ASAP:

1 New Video Board (DONE)
2 Roof Painting/Cleaning (anyone know if there is a plan to clean this up? it is an absolute eyesore)
3 Flip the team benches to the opposite sides of the court. So that they can be seen on TV
4. change seating for student section and press


These are all very simple things that could be done. GET ER DONE!!

Posted by Mr.Perfect
Louisiana
Member since Mar 2013
17438 posts
Posted on 7/20/17 at 1:21 pm to
quote:

1 New Video Board (DONE)


AWESOME

quote:

2 Roof Painting/Cleaning (anyone know if there is a plan to clean this up? it is an absolute eyesore)


Could not care less. Spend the money elsewhere.

quote:

3 Flip the team benches to the opposite sides of the court. So that they can be seen on TV


Not going to happen. LSU and Sports Properties want to full length advertising. Its one of the few (if not only) in the country and they get more revenue from having ads in the background once the camera pans to one side of the court vs only having it when the camera passes midcourt. I agree with you, its just NOT happening.

quote:

4. change seating for student section and press


Agreed

Posted by boodro
Lafayette
Member since Jul 2013
872 posts
Posted on 7/20/17 at 1:26 pm to
quote:

awesome....now fix the student section and we may be getting somewhere close to a decent atmosphere again
Start Winning and they will come!
Posted by CajunsTigersSaints
Member since Jan 2015
4532 posts
Posted on 7/20/17 at 4:55 pm to
Like the curve look.

Looks really nice.
first pageprev pagePage 1 of 2Next pagelast page

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram