They're fixed cranes with site built foundations, which are very typical in large construction jobs. There was a thread last month showing the pictures of the foundations.





Back to top
ClayW
LSU Fan
Newnan, GA
Member since Nov 2008
123 posts

re: Cranes going up for the SEZ expansion (Updated)


They are called tower cranes. They are positioned so that their tips overlap. Ensuring crane coverage for the entire site. I haven't seen the plans, but they usually build the structure around them. Break them down and pull then out at the end. The hole left will be filled in afterwards. Concrete etc...





Back to top
junkfunky
LSU Fan
Member since Jan 2011
13855 posts

re: Cranes going up for the SEZ expansion (Updated)


Yep. I haven't personally had a contractor use one on the projects I've worked on but a couple of the guys in our office have for the $100,000,000 jobs we get occasionally.





Back to top
ClayW
LSU Fan
Newnan, GA
Member since Nov 2008
123 posts

re: Cranes going up for the SEZ expansion (Updated)


Yeah. I worked for the GC doing the work for 5yrs. Very familiar with them. Bad thing is they have a mass of Gumps and Auburn fans working for them. Prob the same crew / team that did Alabamas expansion. That's my only disappointment. My employer prior to them did the last expansion at LSU. Think that was during Dinardos tenure. He gave a number of us old game worn helmets at the end. I got Demetrius Hookfins helmet. Has his number and name inside it. Pretty cool


This post was edited on 3/13 at 5:41 pm


Back to top
Jefferson Davis
LSU Fan
Plank Road
Member since Nov 2011
5776 posts
 Online 

re: Cranes going up for the SEZ expansion (Updated)


quote:

Did you ever get a chance to peruse the master plan?


The master plan for the Nicholson corridor? If so then yes and I was very impressed. Wish that could have been done before I got here.






Back to top
Flanders
USA Fan
Anchorage
Member since May 2008
7927 posts

re: Cranes going up for the SEZ expansion (Updated)


quote:

The master plan for the Nicholson corridor? If so then yes and I was very impressed. Wish that could have been done before I got here.

What are your thoughts on the nicholson expansion? Any chance of a rail car because I've heard it discussed. I saw the plans that came out the other day and it looked very nice.



This post was edited on 3/13 at 6:43 pm


Back to top
MRTigerFan
Southeastern LA Fan
Baton Rouge
Member since Sep 2008
2540 posts

re: Cranes going up for the SEZ expansion (Updated)


Look who got their avi back.





Back to top
Sev09
LSU Fan
Brandon Harris Fan Club, Founder
Member since Feb 2011
7295 posts

re: Cranes going up for the SEZ expansion (Updated)


This is the best part of the construction process. We'll see a lot of architecture being thrown up over these next few months.





Back to top
GeorgeReymond
LSU Fan
Louisiana
Member since Jan 2013
3430 posts

re: Cranes going up for the SEZ expansion (Updated)


I am really excited about the Nicolson project. Will help that side of campus alot. They will eventually move over University Press/ect off sorority row and move it over to the new area on Nicolson and will make sorority row all Greek Housing. The new "complex" is going to be great during game days and for visitors. I believe the railway will happen also. Might try and squeeze in a few minors and such to push back graduation.





Back to top
  Replies (0)
CarRamrod
USA Fan
Spurbury, VT
Member since Dec 2006
34686 posts

re: Cranes going up for the SEZ expansion (Updated)


quote:

They're fixed cranes with site built foundations, which are very typical in large construction jobs. There was a thread last month showing the pictures of the foundations.
no shit? I was laughing because your post made it seem you thought it took months to build the foundations just for the cranes.






Back to top
Jefferson Davis
LSU Fan
Plank Road
Member since Nov 2011
5776 posts
 Online 

re: Cranes going up for the SEZ expansion (Updated)


quote:

What are your thoughts on the nicholson expansion? Any chance of a rail car because I've heard it discussed.


I was very happy with it. There is so much potential on that side of campus and right now it is being completely underutilized. I particularly liked the plans for the old Alex Box site and the pedestrian greenway running between the Natatorium and the Field House.

As for a rail line, I could definitely see it happening down the road. Apart from funding issues, I can't imagine it would actually happen until the area between LSU and downtown is "cleaned up" a bit more.



This post was edited on 3/14 at 12:08 am


Back to top
  Replies (0)
BRAVEHEART
LSU Fan
Member since Aug 2012
1525 posts

re: Cranes going up for the SEZ expansion (Updated)


quote:

We'll see a lot of architecture being thrown up over these next few months.
Just think, when the SEZ expansion is finally finished, we'll have what is essentially FOUR different Tiger Stadium's. North Tiger Stadium. South TS. East TS. West TS. Do a 360 walk around the stadium and you'll see four different architectural styles that have no resemblance and do not blend into each other aesthetically. About the only thing that's going to even remotely match up are the "Arches" from the North and the new South.

I assume the AD is also going to replace the old windows and refinish the exterior facade on the West and East just like on the North.

BTW, the North side looks awesome at night with all the P + G lighting, as will the new South if they do the same illumination technique there.






Back to top
  Replies (0)
snake23
LSU Fan
NOLA/BR
Member since Dec 2011
3493 posts

re: Cranes going up for the SEZ expansion (Updated)


quote:

The master plan for the Nicholson corridor

Where can these plans be viewed?






Back to top
manwich
UCF Fan
You've wanted my
Member since Oct 2008
52480 posts

re: Cranes going up for the SEZ expansion (Updated)


quote:

He gave a number of us old game worn helmets at the end. I got Demetrius Hookfins helmet

OWNED






Back to top
Veritas
George Washington Fan
Northern Virginia
Member since Feb 2005
2315 posts

re: Cranes going up for the SEZ expansion (Updated)


Wow I just checked out Preserve Death Valley and I can not wait for this to be done.





Back to top
  Replies (0)
junkfunky
LSU Fan
Member since Jan 2011
13855 posts

re: Cranes going up for the SEZ expansion (Updated)


quote:

no shit? I was laughing because your post made it seem you thought it took months to build the foundations just for the cranes.


Of course they don't take that long to get one operational if really needed. You could probably have the piling done in a day, the formwork done in a few days and ready to pour and then at least 7 days for the breaks. So within 2 weeks you can have all 3 operational if you put enough man power behind but that's not what usually happens and isn't what happened on this project. They took at least a month and half, probably longer from start to finish.



This post was edited on 3/14 at 1:27 pm


Back to top
Jefferson Davis
LSU Fan
Plank Road
Member since Nov 2011
5776 posts
 Online 

re: Cranes going up for the SEZ expansion (Updated)


quote:

snake23


Here you go:

LINK






Back to top
  Replies (0)
contactmo
Member since Jan 2012
111 posts

re: Cranes going up for the SEZ expansion (Updated)


In case no one knew it existed... Images are from noon noon the previous day.

LINK



This post was edited on 3/14 at 1:42 pm


Back to top
  Replies (0)
MRTigerFan
Southeastern LA Fan
Baton Rouge
Member since Sep 2008
2540 posts

re: Cranes going up for the SEZ expansion (Updated)


quote:

Of course they don't take that long to get one operational if really needed. You could probably have the piling done in a day, the formwork done in a few days and ready to pour and then at least 7 days for the breaks. So within 2 weeks you can have all 3 operational if you put enough man power behind but that's not what usually happens and isn't what happened on this project. They took at least a month and half, probably longer from start to finish.


How dare you bring that kind of accurate knowledge and actually state facts on the rant! GTFO






Back to top
junkfunky
LSU Fan
Member since Jan 2011
13855 posts

re: Cranes going up for the SEZ expansion (Updated)


quote:

How dare you bring that kind of accurate knowledge and actually state facts on the rant! GTFO


I know what Ram was talking about, and I kinda did make it sound like it was a typical construction time.

What's been going on? Yeah, after the source for my teabagger pick was removed I tried using this old one. The timing was weird but apparently it didn't meet the size requirements.

You watching the game?






Back to top


Back to top