Posted by CHEDBALLZ on 2/27 at 11:35 am
LINK


quote:

The long-awaited Prospect Bridge in Houma was set to open to traffic today after a series of construction delays that have repeatedly aggravated local motorists.

The new bridge has remained closed to traffic pending the arrival of mechanical and electrical components needed to complete the project, the state Transportation Department says in a news release. Transportation workers recently performed an inspection of the new bridge and determined that it could be safely opened to traffic until the contractor receives the new parts.

Agency officials said they expect the new parts to arrive in the next six to seven weeks. Once received, the bridge will close to traffic for about a week while the parts are being installed and tested.

The work will include replacing plugging switches on the upper machinery platforms, which act to reverse the main drive motors when the bridge deck is being lowered and into place, the agency says. This component of the bridge acts as a secondary braking system that helps the bridge deck lower gently into place.





It's only a year behind schedule.



Reply  •  Back to Top
Posted by Chair on 2/27 at 11:41 am to CHEDBALLZ
So it's opening today but still needs parts???




Reply  •  Back to Top
Posted by jambrous on 2/27 at 11:52 am to CHEDBALLZ
It's about frickin time. Damn bridge took 3 years to build..... I had heard they were getting fined like 5 grand a day. Contractor lost his arse on that one.


Reply  •  Back to Top
Posted by longhorn22 on 2/27 at 11:54 am to CHEDBALLZ
bout time


Reply  •  Back to Top
Posted by jose on 2/27 at 11:55 am to CHEDBALLZ
Bout damn time. Only been what 13 years?


Reply  •  Back to Top
Posted by Broski on 2/27 at 12:03 pm to jose
It says it's been under construction since 2010, that can't be right. It feels like it's been 6-7 years atleast.


Reply  •  Back to Top
Posted by longhorn22 on 2/27 at 12:06 pm to jose
it will make it easier to get to softball games


Reply  •  Back to Top
Posted by CHEDBALLZ on 2/27 at 12:13 pm to longhorn22
It is a $28,000,000 project. By having it open for 7 weeks till the new parts come in its going to save them $269,500.@ $5,500 daily fine. This bridge should have never been a lift bridge anyway, there is not enough boat traffic to warrant that.

This particular contractor never finsishes a bridge on time. They have the same problems going on in Larose.



Reply  •  Back to Top
Posted by Broski on 2/27 at 12:20 pm to CHEDBALLZ
quote:

This bridge should have never been a lift bridge anyway, there is not enough boat traffic to warrant that.



Wasn't the one that was there before a lift bridge though?



Reply  •  Back to Top
Posted by CHEDBALLZ on 2/27 at 12:28 pm to Broski
Yes there was a 2 lane bridge, this one is 5. However, if it opened 10 times a year it opened plenty. There is only about a 4 mile stretch from there to the Presquell Isle Bridges and neither of them open. They could have developed a marina (which the already have the downtown marina) for all the people who have boats in that stretch. For a lot less money and time


Reply  •  Back to Top
Posted by CootKilla on 2/27 at 12:42 pm to CHEDBALLZ
So you gonna go home that way today?


Reply  •  Back to Top
Posted by Casty McBoozer on 2/27 at 12:48 pm to Broski
quote:

t says it's been under construction since 2010, that can't be right. It feels like it's been 6-7 years atleast.

They're probably not counting the tear-down of the old bridge and a lot of prep work before the actual bridge contstruction started. I think it was more like 2008 when traffic was closed off to the bridge.



Reply  •  Back to Top
Posted by LakeCountryRed on 2/27 at 12:54 pm to Casty McBoozer
quote:

They're probably not counting the tear-down of the old bridge and a lot of prep work before the actual bridge contstruction started. I think it was more like 2008 when traffic was closed off to the bridge


Wrong, traffic/bridge was closed on May 24, 2010.



Reply  •  Back to Top
Posted by Motorboat on 2/27 at 1:00 pm to CHEDBALLZ
quote:

Prospect Bridge Opening Today


frick yeah. no more detour through Presque Isle




Reply  •  Back to Top
Posted by LakeCountryRed on 2/27 at 1:03 pm to CHEDBALLZ
quote:

This bridge should have never been a lift bridge anyway, there is not enough boat traffic to warrant that. 


Agreed; however, Bayou Terrebonne is still considered a navigable waterway at that location through the eyes of the federal government. So, building a fixed bridge across would have literally taken an act of congress.



Reply  •  Back to Top
Posted by CHEDBALLZ on 2/27 at 7:15 pm to LakeCountryRed
Cut 6 minutes off my trip home


Reply  •  Back to Top  •  Refresh
Return to Board
Jump to Page   

           Page 1 of 1           

 

 Message Boards
 Tiger Rant
 Score Board
 Recruiting Board
 SEC Rant
 Saints Talk
 Pelicans Talk
 More Sports Board
 Soccer Board
 O-T Lounge
 Tech Board
 Outdoor Board
 Movie/TV Board
 Music Board
 Political Talk
 Money Talk
 Fark Board
 Gaming Board
 Fantasy Sports
 Food and Drink Board
 Ticket Exchange
 Help Board
 

 Other Options
 >> Search
 

 SECRant.com Links
 SEC Rant
 SEC Recruiting
 SEC Tickets
 Off-Topic Board
 

 Geaux.com Dining Guide
 New Orleans
 Baton Rouge
 

 Site Features (Full Version)
 Home Page
 LSU Football Schedule
 LSU News/TD News Wire
 Pick'em Home Page
 
Back to top
Sign In 
View in: Desktop
Copyright ©2014 TigerDroppings.com.