re: Pipeline on farmland

Posted on 12/19/22 at 3:14 pm to
Posted by CharleyLake
Member since Oct 2006
1327 posts
Posted on 12/19/22 at 3:14 pm to
If that is the case, is FERC authorization required to begin construction?
Posted by Merica
'Merica
Member since Mar 2013
983 posts
Posted on 12/19/22 at 6:28 pm to
If it is FERC regulated then FERC approval is absolutely necessary to begin construction. If they are in the land acquisition portion of the project, then they have not even submitted their FERC application so construction would begin at earliest 2024. FERC approval takes 12-18 months.

If it isn’t FERC related then it’s all a wash and construction could begin much earlier. All they would need is LDNR approval.